Blog

Unified Management for 1,700 telecoms buildings

Unified Management for 1,700 telecoms buildings

  • On April 26, 2018

Inaccess celebrates the successful deployment of Inaccess CMS, its centralized SCADA solution at a Tier 1 quad-play telecommunications operator in Europe, monitoring 1,700 manned and unmanned buildings.
 
In this deployment, a powerful NOC (Network Operation Center) enables the operator to manage and control in real-time more than 11,000 electro-mechanical units (equivalent to 400,000+ tags), including among others: 
  • 4,000 Air Cool CCUs and Water Cool CCUs
  • 450+ Dry Compressed Air Systems
  • 150+ MV Substations
  • 1,300+ Backup Diesel Generators
  • 1,800+ Rectifiers
  • 500+ Fire Protection Systems
  • 1000+ Multi-meters and Energy Meters
Key Benefits: 
-operational continuity and efficiency
-increased network availability and reliability
-significant OPEX reduction
Reporting:
Inaccess CMS integrates a powerful business intelligence platform for enhanced data analysis and reporting